Blank figures, refused actions and blocking validation.
Results shows dashes instead of numbers
Production is not established. Complete the energy inputs and the site's solar resource, then return to Results.
Auto String refuses to run
The engine refuses when the data does not support a decision, for example a missing datasheet value or an unknown equipment relationship. The refusal names the reason.
A string shows a blocking failure
Blocking failures must be resolved, not overridden. Common causes are a string too long for the inverter at the design temperature, an optimizer count outside the manufacturer range, or a microinverter branch above its branch device allowance.
A circuit says it is out of date
Modules referenced by the circuit are no longer in the layout. Re-string that face or restore the modules.
The design will not continue to a proposal
Work through the checklist items; each one links to the step that fixes it.
Related articles
- Solar DesignStringing validation and errorsThe five validation outcomes and the failures that block a design.
- Solar DesignEnergy inputs and the Results stepCapture usage and rates, then read production, offset and savings.
- Solar DesignWhere design data comes from, and its limitsData sources, provenance, unresolved inputs and what ClickSabi does not certify.
- TroubleshootingAccess and workspace problemsSign-in, workspace access and invitation issues.
Didn't find what you were looking for?
Get in touch with the ClickSabi team or send feedback about the Help Center.
Prefer email? support@mail.clicksabi.com