ClickSabi Pro
Solar Design
How the Solar Design workspace supports layout, equipment and approval decisions.
11 articles available
11 articles
- Understanding the solar design workflowThe seven guided steps and how a design reaches a proposal.
- Setting the property and roofLocate the site, confirm the property, and resolve each roof plane.
- Obstructions, keep-outs and walkwaysMark everything that removes usable roof before placing modules.
- Placing and adjusting modulesAuto fill, manual placement, bulk edits and undo.
- Choosing modules, inverters and batteriesThe equipment step, what it requires, and where the catalogue comes from.
- Understanding MPPTs and stringingThe electrical tree, Auto String, Add String and multi-inverter behaviour.
- Stringing validation and errorsThe five validation outcomes and the failures that block a design.
- Energy inputs and the Results stepCapture usage and rates, then read production, offset and savings.
- Where design data comes from, and its limitsData sources, provenance, unresolved inputs and what ClickSabi does not certify.
- Structural and mounting informationWhat structural facts are recorded and what they do not mean.
- Taking a design to a proposalApprove the design, then hand it to Proposal Studio.
Didn't find what you were looking for?
Get in touch with the ClickSabi team or send feedback about the Help Center.